The Smithy

Budget: £450k +
Full internal renovation including the removal of an old roof and the addition of a second floor with a master bedroom balcony. Installation of a new Sachsenkutchen kitchen with Dekton tops. Upgraded with a new air source heat pump and full electrical rewiring, all while preserving the home’s period features.






